class ti 120 Spindle moulder with tilting spindle
19% Black Friday
A$26,161.38(Price does not include taxes, shipping and installation)
Scm class ti 120 spindle moulders with tilting spindle have a modern dual vacuum system which, thanks to two outlets positioned to the side of the spindle moulder shaft, ensure the machine is cleaned perfectly and the work environment kept healthy.
*Photos may include optional equipment. Please verify availability and compatibility under Product Details and Specs.
Set up precision and reliability
The operator easily adjusts every movement thanks to the handwheels with mechanical readout positioned on the machine front.
Adjustable spindle moulder fence: easy to use
A handle provides the setting-up of the infeed table, which effects the removal and it is verified by an index on a metric scale.
BULLET POINTS
-
Manual tool-holder shaft lifting, complete with mechanical readout of working height
-
Manual tool-holder shaft tilting, complete with mechanical readout of working height
-
Adjustable fence with wooden tables complete with exhaust hood and connecting wooden table
-
Max. tool diam. 250 mm
-
Speed display dial
-
Electrical presetting for feeder
-
Spindle protection for operations (160 mm max. tool diameter)
-
Emergency pushbutton
-
Safety microswitches on spindle locking
-
Safety microswitch on motor access door
-
Padlockable main switch
-
Overload switch protection
-
Auxiliary low voltage circuit (110 volt)
-
Automatic brake on main motor
-
Certificate of conformity "C.E. standards"
TECHNICAL DATAS
| Dati tecnici |
| class ti 120 |
| Worktable dimensions | [mm] | 1200 x 810 |
| Spindle tilting | [gradi] | +45° ; -45° |
| Working length of spindle diam. 30-35 (40-50)
| [mm] | 140 (180) |
| Spindle base projection from table with interchangeable spindle | [mm] | 53 |
| Max tool diam. retractable under worktable with rings (with "Fast" section table) | [mm] | 320 x 60 |
| Spindle fence stroke with mechanical programming (positioning with respect to the spindle axis) | [mm] | 125 (da -90 a +125) |
| Motor power |
| 7kW (9,5hp) 50Hz with automatic triangle-strar start |
| External diameter of exhaust outlet on spindle moulder hood | [mm] | 120 |
| External diameter of exhaust outlets on base (for the forced electrospindle aircooling 7,5 kW) | [mm] | 2 x 80 |
| Air flow speed of exhaust system | [m/s] | 20 |
| Exhaust system air consumption | [m3/h] | 1550 |
| INSTALLATION DATAS |
|
|
| Absorbed power | [A] | 19 |
| Voltage – Frequency |
| 400V – 50Hz |
DELIVERY, FREIGHT & INSTALLATION INFORMATION
For any questions regarding delivery, freight or your order, please contact the SCM Australia & New Zealand Customer Care Team.
To assist with planning for delivery and unloading, the packaged machine dimensions and weight are provided below:
| Packaged Machine | Measurement | |
| Length | cm | 169,0 |
| Width | cm | 140,0 |
| Height | cm | 156,0 |
| Weight | kg | 779,0 |
DELIVERY OPTIONS
Before completing your purchase, please review the available delivery options:
1 - Collection from SCM (EXW – Ex Works)
Where available, the machine can be collected directly from an SCM Australia warehouse or nominated collection location. The applicable collection location and availability will be confirmed by our team.
2 - Delivery by Freight Carrier (DAP – Delivered at Place)
SCM can arrange delivery to the nominated delivery address using an appropriate freight carrier.
Please note: Any freight cost displayed or advised during the E-Shop ordering process is a preliminary estimate only and is subject to confirmation.
Following submission of your order, the SCM Australia & New Zealand team will review the delivery requirements and confirm the final freight cost based on the delivery location, machine dimensions, weight and any additional delivery requirements.
Where required, our team will contact you before the order is processed to discuss the final freight arrangements and associated costs.
DELIVERY & UNLOADING REQUIREMENTS
Unless otherwise confirmed in writing, delivery is to the nominated delivery location only.
The customer is responsible for ensuring suitable access to the site and for arranging any equipment required to safely unload, move and position the machine, including a forklift, crane or other suitable lifting equipment, where required.
Internal movement and final positioning of the machine are not included unless specifically quoted and agreed with SCM.
If you have specific delivery requirements, restricted site access or require assistance with unloading arrangements, please advise our team before delivery is arranged.
INSTALLATION
If the machine has been purchased with SCM installation, our Service Department or authorised service representative will contact you following order confirmation to coordinate the installation requirements, including:
- Installation date and technician attendance
- Site access and preparation requirements
- Required lifting or handling equipment
- Electrical, pneumatic or other machine requirements
- Documentation required before installation
If installation is not included with your purchase and you would like SCM to provide installation, please contact our Customer Care or Service Team for a quotation.
INSTALLATION, OPERATION & SAFETY
The machine must be installed, commissioned and operated in accordance with the manufacturer's instructions, applicable safety requirements and the supplied operating documentation.
Where a customer elects not to use SCM installation, the customer is responsible for ensuring the machine is correctly installed and operated in accordance with the manufacturer's requirements and applicable safety standards.
If you have not received the applicable machine documentation or user manual, please contact SCM Australia & New Zealand and provide the machine serial number so the appropriate documentation can be provided before installation or operation.
WARRANTY ACTIVATION
Where SCM installation is not required, the applicable warranty activation form (VICA) must be completed and returned within 10 business days of delivery, in accordance with the warranty requirements.
The form will be provided with the applicable order documentation or can be requested from SCM Australia & New Zealand.
Failure to complete the required warranty activation process may affect warranty coverage.
For any further information regarding your order, freight, delivery, installation or warranty requirements, please contact the SCM Australia & New Zealand team.

